Friday, January 18, 2019

Finish-A-Long 2019 Q1 Goals

 1.  This Green BOM Sampler was on my list last quarter.  I just finished quilting it.  Just need to bind.


2.  For years, I have been meaning to sew a new cushion for our dining table bench.  I have the fabric and will not be using a pattern -- but I will be measuring better this time!

3.  This quilt is one I started -- I finished all the blocks but just don't like it very much.  I think I'll use the blocks to make HST blocks and see if that helps.


4.  Twin Quilt #1 -- No picture -- Top is finished, quilting is finished (as of today!)  Need to bind.

5.  Twin Quilt #2 -- No picture --Top is finished.  Backing is ready.  Need to baste, quilt, and bind.

6.  Book Quilt -- No picture -- top is done.  Need to prep the backing, baste, quilt, and bind.

7.  Fabric Trays -- No picture -- I wanted to make some little fabric trays for my boys before Christmas.  Didn't get to it.  

I'm linking up to the Finish-A-Long linky party at She Can Quilt.


No comments:

Post a Comment